# Analysis

You can configure workspace-level calculation preferences by clicking on **“Analysis”** under **Functional Settings** in the Admin left navigation bar.

The Analysis page allows you to select the **Critical Path calculation mode** that will be used across the workspace. This setting determines the method used to identify the activities that drive the overall project completion date. 

![](https://cdn-assets.productfruits.com/88411869-216b-46f6-bb50-904219066b1a)

### Available calculation modes

| Calculation mode | Description |
| --- | --- |
| **Longest Path** | The critical path is taken directly from the longest path as defined in the uploaded `.xer` |
| **Total Float** | The critical path is calculated based on the float values of activities. |

### To change the Critical Path calculation mode:

1.  Navigate to **Admin** from the main navigation bar.
2.  Under **Functional Settings**, click **“Analysis.”**
3.  Open the **“Critical Path calculation mode”** drop-down list.
4.  Select either **“Longest Path”** or **“Total Float.”**
5.  Click **“Save”** to apply the selected calculation preference.

The selected setting is applied at workspace level and will be used when determining the critical path in project schedule analysis.

> 🧠 This setting affects how the project’s critical path is displayed across the platform — including in Timelines, Paths, and Reports.