---
title: "Permissions"
url: "https://help.nodeslinks.com/en/article/permissions"
language: "en"
last_updated: "2026-09-09T19:41:11.078Z"
---

# Permissions

You can manage workspace-level permissions on the admin tool by clicking on **“Permissions”** in the left navigation bar.

The Permissions page allows you to control which actions Contributors and Members can perform across your N&L workspace. Permissions are organized into two sections: **Access** and **Project Creation**.

Under **Access**, you can choose whether Contributors and Members are allowed to:

-   Edit integrity checks settings.
-   Edit portfolio KPI thresholds.

These settings help you control access to sensitive configuration areas while ensuring the appropriate users can update portfolio and integrity-check information when needed.

Under **Project Creation**, you can choose whether users must select a Program when creating a new project.

### To update permissions:

1.  Navigate to **Admin** from the main navigation bar.
2.  Click **“Permissions”** in the left navigation menu.
3.  Turn a permission **on** to allow the action, or **off** to restrict it.
4.  Click **“Save”** to apply the changes.

### Available permissions:

| Permission | What it controls |
| --- | --- |
| Contributor can edit integrity checks settings | Allows users with the Contributor role to update integrity-check settings. |
| Contributor can edit portfolio KPI thresholds | Allows users with the Contributor role to update portfolio KPI thresholds. |
| Member can edit integrity checks settings | Allows users with the Member role to update integrity-check settings. |
| Member can edit portfolio KPI thresholds | Allows users with the Member role to update portfolio KPI thresholds. |
| Require program on project creation | Makes selecting a Program mandatory when a new project is created. |

Changes only take effect after selecting **“Save.”**
