Release 140 – Finally, your projects can talk back

This release gives every stakeholder new ways to ask questions, keep data current, and review schedules without leaving Nodes & Links.

What’s New in Release 140?
 

1. AI Mode: your project can finally talk back


 

AI Mode lets every stakeholder ask questions in natural language and get answers that combine multiple analyses into one narrative. Instead of stitching together several screens, users can ask what changed, why it matters, and what to focus on next, and AI Mode assembles an answer that is ready to review and share.


What’s new?

  • Ask questions such as “Why are we late?”, “What changed since last month?”, or “What should we focus on next?” and get clear, structured explanations.​
  • Let AI Mode run the right schedule, change, and risk workflows in the background, then join the results into a single story instead of separate charts and tables.​
  • Move from analysis to action in one flow by drafting emails, summaries, and talking points directly from the answer.​
  • Rely on the same underlying models as Platform Mode, so answers stay aligned with how your teams already review projects.​

🎯 Use case solved: Stakeholders can go from “What happened?” to “What do we do next?” without needing to be experts in each workflow.​

2. Enterprise data imports via API: keep large portfolios current by default

We added APIs that let teams bring schedules into Nodes & Links automatically, instead of relying on manual uploads. This makes it easier to connect existing tools and keep projects up to date as part of your normal pipeline.

What’s new?

  • High volume, automated schedule imports via APIs keep portfolios current with minimal manual effort.​
  • Schedule imports can be run at scale so hundreds of schedules can be brought in or refreshed in minutes.​
  • Integration options are designed to work across different tech stacks, so organizations can connect Nodes & Links to their existing systems.​

🎯 Use case solved: Enterprises can make Nodes & Links part of their standard pipeline and workflow, reducing onboarding friction and ensuring that AI Mode and Platform Mode always work from the latest data.​


Why These Changes Matter
 

AI Mode builds on the expert foundations of Platform Mode, so answers stay auditable, trustworthy, and consistent with formal project controls practice. Enterprise data imports via API ensure this intelligence always works from current, complete project data without extra manual steps.

Together, Release 140 helps teams move from separate analyses to connected stories, and from manual refreshes to automated pipelines that keep schedules ready for review and action.