---
title: "Release Log"
url: "https://help.nodeslinks.com/en/article/release-log"
language: "en"
last_updated: "2026-09-10T08:54:16.291Z"
---

# Release Log

## **Release 156 — 10 Sept 2026**

-   **Schedule Optimizer**: A new guided tool that analyses your live schedule against one objective, proposes realistic changes, and lets you review, accept, and download the result as a new schedule file — your original is never modified. Impact is shown as High/Medium/Low, with a single forecasted improvement figure on the review screen.
-   **Enforce MFA**: Workspace admins can now require multi-factor authentication for every user in the workspace — so your schedules and project data stay safe even if a password is compromised.
-   **Unification of Admin controls**: Admins now have a their on page in the product to manage their accounts. 
-   **Global search**: Find any activity from anywhere in the platform and open its story overlay in one click — identity, key stats, and actions without ever leaving your screen.

## **Release 155 — 26 Aug 2026**

-   **Opportunities and Threats:** A new Category column in the Risk Register lets users classify every risk event as a Threat or an Opportunity. Default is Threat. Impact values are always positive — the category determines whether the effect is a delay or a schedule gain

## **Release 154 — 9 Aug 2026**

-   **Timeline upgraded to Gantt**: The **Timeline** screen gets upgraded with **Path Analysis** and an option to browse activities without the hierarchy
-   **Global Risk Register**: Cross-project risk governance is now reliable — assignments, settings, and ACS filtering all work correctly
-   **Change Control Polish**: Redesigned activity pop-up to show valuable information right away

## **Release 153 — 28 Jul 2026**

-   **Global Invites**: Invite collaborators to multiple projects at once, directly from inside any project
-   **Gantt view controls**: Switch to flat view, hide the bar chart, or change hierarchy — all from the config dialog
-   **Insights Digest**: Subscribe per project, receive insights the moment a new version is uploaded, manage or cancel anytime

## **Release 152 — 14 Jul 2026**

-   **Risk & QSRA overhaul**: Risk events and duration uncertainty are now on one merged tab; headers simplified to Min/Prob/Max; results tables are collapsible to reclaim space for the chart
-   **Portfolio programme controls**: Programme filter and project creation selector are now platform-wide, with admin governance over KPI thresholds and whether programme selection is optional or mandatory

## **Release 151 — 30 Jun 2026**

-   **Portfolio program hierarchy**: Organise projects in a 7-level named hierarchy and assign them to **Programs** at creation
-   **Filter projects by program**: The **Projects** page now supports program-based filtering for large portfolios

## **Release 150 — 22 Jun 2026**

-   **Insights in AI Mode**: Proactive AI that surfaces issues, opens questions, and brings the whole team into the conversation — solving the "I don't know what to ask" problem
-   **OPC Baselines & Scenarios**: Import **Baselines** and **Scenarios** directly from OPC into your N&L project
-   **Portfolio upgrades**: Define people responsible for a project and a range of other portfolio-level improvements

## **Release 149 — 2 Jun 2026**

-   **Multi schedule upload**: Adding a new project to Nodes & Links is now only a few minutes away — upload all schedules at once instead of one file at a time
-   **Portfolio map**: Filter the **Portfolio Overview** by Programme or Portfolio and read KPI metrics as pie charts on a world map — geography and performance in a single view

## **Release 148 — 20 May 2026**

-   **Risk Analysis redesign**: Six targeted improvements to the **Risk** workspace — fuzzy activity search, multiselect with one-click profile assignment, chip-style risk events, and a fully modernised layout with clearer results panel
-   **Portfolio KPI trends**: Every KPI in the **Portfolio** now shows a trend indicator — see instantly whether each project is improving or declining across all metrics, directly on the Projects page

## **Release 147 — 6 May 2026**

-   **AI Autopilot**: Autopilot watches your programme continuously so your best people only engage when it matters — experts deployed by exception, not by default
-   **New Portfolio Dashboard**: Define what "good" looks like with configurable KPI thresholds, a map widget showing regional portfolio health, ranked lists of failing projects, and a live activity feed across all projects

## **Release 146 — 20 Apr 2026**

-   **Mobile access (MVP)**: Nodes & Links is now accessible from a **mobile device** for the first time
-   **OPC live updates**: Projects show a notification when a newer OPC version is available, with one-click import
-   **PAD Prediction overhaul**: Hide completed activities, sort by progress status, export to Excel, and persist WBS/ACS selection
