Schedule Optimizer: A new guided tool that analyses your live schedule against one objective, proposes realistic changes, and lets you review, accept, and download the result as a new schedule file β your original is never modified. Impact is shown as High/Medium/Low, with a single forecasted improvement figure on the review screen.
Enforce MFA: Workspace admins can now require multi-factor authentication for every user in the workspace β so your schedules and project data stay safe even if a password is compromised.
Unification of Admin controls: Admins now have a their on page in the product to manage their accounts.
Global search: Find any activity from anywhere in the platform and open its story overlay in one click β identity, key stats, and actions without ever leaving your screen.
Release 155 β 26 Aug 2026
Opportunities and Threats: A new Category column in the Risk Register lets users classify every risk event as a Threat or an Opportunity. Default is Threat. Impact values are always positive β the category determines whether the effect is a delay or a schedule gain
Release 154 β 9 Aug 2026
Timeline upgraded to Gantt: The Timeline screen gets upgraded with Path Analysis and an option to browse activities without the hierarchy
Global Risk Register: Cross-project risk governance is now reliable β assignments, settings, and ACS filtering all work correctly
Change Control Polish: Redesigned activity pop-up to show valuable information right away
Release 153 β 28 Jul 2026
Global Invites: Invite collaborators to multiple projects at once, directly from inside any project
Gantt view controls: Switch to flat view, hide the bar chart, or change hierarchy β all from the config dialog
Insights Digest: Subscribe per project, receive insights the moment a new version is uploaded, manage or cancel anytime
Release 152 β 14 Jul 2026
Risk & QSRA overhaul: Risk events and duration uncertainty are now on one merged tab; headers simplified to Min/Prob/Max; results tables are collapsible to reclaim space for the chart
Portfolio programme controls: Programme filter and project creation selector are now platform-wide, with admin governance over KPI thresholds and whether programme selection is optional or mandatory
Release 151 β 30 Jun 2026
Portfolio program hierarchy: Organise projects in a 7-level named hierarchy and assign them to Programs at creation
Filter projects by program: The Projects page now supports program-based filtering for large portfolios
Release 150 β 22 Jun 2026
Insights in AI Mode: Proactive AI that surfaces issues, opens questions, and brings the whole team into the conversation β solving the "I don't know what to ask" problem
OPC Baselines & Scenarios: Import Baselines and Scenarios directly from OPC into your N&L project
Portfolio upgrades: Define people responsible for a project and a range of other portfolio-level improvements
Release 149 β 2 Jun 2026
Multi schedule upload: Adding a new project to Nodes & Links is now only a few minutes away β upload all schedules at once instead of one file at a time
Portfolio map: Filter the Portfolio Overview by Programme or Portfolio and read KPI metrics as pie charts on a world map β geography and performance in a single view
Release 148 β 20 May 2026
Risk Analysis redesign: Six targeted improvements to the Risk workspace β fuzzy activity search, multiselect with one-click profile assignment, chip-style risk events, and a fully modernised layout with clearer results panel
Portfolio KPI trends: Every KPI in the Portfolio now shows a trend indicator β see instantly whether each project is improving or declining across all metrics, directly on the Projects page
Release 147 β 6 May 2026
AI Autopilot: Autopilot watches your programme continuously so your best people only engage when it matters β experts deployed by exception, not by default
New Portfolio Dashboard: Define what "good" looks like with configurable KPI thresholds, a map widget showing regional portfolio health, ranked lists of failing projects, and a live activity feed across all projects
Release 146 β 20 Apr 2026
Mobile access (MVP): Nodes & Links is now accessible from a mobile device for the first time
OPC live updates: Projects show a notification when a newer OPC version is available, with one-click import
PAD Prediction overhaul: Hide completed activities, sort by progress status, export to Excel, and persist WBS/ACS selection